Development only. Everything that still needs code written, and nothing else.
Sixty-four items stand between here and a complete, sellable product. Twenty of them are not development work at all: rehearsals, hardware testing, store paperwork, a certificate to purchase, accounts to configure. Strip those out and the engineering queue is the 44 below.
The queue grew while the hardest thing on it was finished. The check-in kiosk was two of the forty items on the last edition and is now written, deployed and publicly serving, which should have taken the queue to 38. It stands at 44 instead, because a deliberate bug sweep of the mobile app found four faults nobody had reported, shipping high hands promoted the screen-signage work that follows it, two gaps a competitor covers were written down for the first time, and two half-finished money features were separated out from the features that already work. None of that is drift. It is what happens when you go looking.
Beyond launch there are a further 132 items in the backlog. They are summarised at the bottom of this page, collapsed, because none of them block launch.
Forty-four items, grouped by the application they land in. Ordered by how much is outstanding, not by priority.
The other twenty launch items. Real work, still required, but nobody writes code for them. Recorded here so it is clear they were removed on purpose rather than missed. With 23 days to the event, this list now matters more than the one above it.
One purchase worth naming separately. The Windows code-signing certificate above is not development work, so it is not in the queue. It nevertheless gates both Windows builds that are, so the two most substantial items on this page cannot ship until someone buys it. Identity vetting for a company certificate can run weeks, which makes it calendar time rather than build time, and the only item here where starting late cannot be recovered by working harder.
The backlog beyond launch. None of it blocks a sellable product.
Compiled 3 September 2026 from the live issue tracker. Every item is tracked, so the figures can be reproduced rather than taken on trust.
How the split was made. Launch-complete is everything in progress or queued, plus every backlog item marked urgent or high priority, plus anything labelled for launch or pilot readiness. From that set, an item counts as a build if an engineer writes code for it. Rehearsals, testing, configuration, paperwork, purchasing and account work do not, and are listed separately above rather than dropped. The 132 backlog items are grouped by theme and are not filtered the same way, because at that distance the distinction is not yet meaningful.
Companion documents: the portfolio summary for what is built and running today, and Full Stack for the narrower question of what the September event alone would need.